Building Construction The taper of precast concrete pile should not be more than 4 cm per metre length 2 cm per metre length 1 cm per metre length 5 cm per metre length 4 cm per metre length 2 cm per metre length 1 cm per metre length 5 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical sides of a door and window openings provided in a wall, are known as Verticals Jambs None of these Reveals Verticals Jambs None of these Reveals ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as Combined footing Raft footing None of these Strap footing Combined footing Raft footing None of these Strap footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The portion of a brick cut across the width, is called Bed Closer Bat Half brick Bed Closer Bat Half brick ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 300 to 350 mm 600 to 650 mm 500 to 550 mm 400 to 450 mm 300 to 350 mm 600 to 650 mm 500 to 550 mm 400 to 450 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to English bond, double Flemish bond is None of these More compact Stronger Costly None of these More compact Stronger Costly ANSWER DOWNLOAD EXAMIANS APP