Building Construction The taper of precast concrete pile should not be more than 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 7 days 4 days 14 days 1 day 7 days 4 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Steel tape Levelling staff Ranging rod Boning rod Steel tape Levelling staff Ranging rod Boning rod ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto 200 cm Level of the tap Ceiling 15 cm above floor level 200 cm Level of the tap Ceiling 15 cm above floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical side member of a shutter frame, is known Post Reveal Style Mullion Post Reveal Style Mullion ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required ANSWER DOWNLOAD EXAMIANS APP