Building Construction The taper of precast concrete pile should not be more than 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.75 du 1.5 du 1.35 du 1.25 du 1.75 du 1.5 du 1.35 du 1.25 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Placing of concrete Compaction of concrete Curing of concrete Finishing of concrete Placing of concrete Compaction of concrete Curing of concrete Finishing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dampness causes Bleaching of paints Growth of termites Efflorescence Crumbling of plaster Bleaching of paints Growth of termites Efflorescence Crumbling of plaster ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Post Mullion Style Reveal Post Mullion Style Reveal ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 12 25 24 18 12 25 24 ANSWER DOWNLOAD EXAMIANS APP