Building Construction The taper of precast concrete pile should not be more than 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Spandril Rise Extrados Intrados Spandril Rise Extrados Intrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 25 to 40 mm 65 to 100 mm 25 mm 40 to 65 mm 25 to 40 mm 65 to 100 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In clay soil All listed here Differential settlement is generally prevalent Consolidation continues even after several years of construction Swelling and shrinkage characteristics prevail All listed here Differential settlement is generally prevalent Consolidation continues even after several years of construction Swelling and shrinkage characteristics prevail ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger borings are not common In soils that require lateral support In soft soils None of these In cohesive soils In soils that require lateral support In soft soils None of these In cohesive soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of the ground water table may be ascertained by Looking through the well in the vicinity None of these Measuring the depth of water in the well Standing on the well in the vicinity Looking through the well in the vicinity None of these Measuring the depth of water in the well Standing on the well in the vicinity ANSWER DOWNLOAD EXAMIANS APP