Building Construction The taper of precast concrete pile should not be more than 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Clay soils Rocky soils Sandy soil All of these Clay soils Rocky soils Sandy soil All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum depth of foundation in clayey soils is 0.9 m 1.2 m 0.7 m 0.5 m 0.9 m 1.2 m 0.7 m 0.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Arches in the form of masonry arcs struck from more than four centres, are called Two curved arches Gothic arches Drop gothic arches Ogee arches Two curved arches Gothic arches Drop gothic arches Ogee arches ANSWER DOWNLOAD EXAMIANS APP
Building Construction The opening provided in sloping roof with its top parallel to the roof surface, is called Louvered window Dormer window Lantern window Sky light window Louvered window Dormer window Lantern window Sky light window ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to Rankine's formula, minimum depth of foundations, is (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] ANSWER DOWNLOAD EXAMIANS APP