Building Construction In clay soil Differential settlement is generally prevalent Swelling and shrinkage characteristics prevail All listed here Consolidation continues even after several years of construction Differential settlement is generally prevalent Swelling and shrinkage characteristics prevail All listed here Consolidation continues even after several years of construction ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 40 m 10 m 15 m 20 m 40 m 10 m 15 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In flat roof of reinforced cement concrete, the recommended angle of slope, is 200° 10° A few degrees Zero 200° 10° A few degrees Zero ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 1 day 14 days 4 days 7 days 1 day 14 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Auger boring Is the most primitive method for making a hole in the ground Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table All of these Is the most primitive method for making a hole in the ground Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Spandril Intrados Rise Extrados Spandril Intrados Rise Extrados ANSWER DOWNLOAD EXAMIANS APP