Building Construction The depth of the ground water table may be ascertained by Standing on the well in the vicinity None of these Measuring the depth of water in the well Looking through the well in the vicinity Standing on the well in the vicinity None of these Measuring the depth of water in the well Looking through the well in the vicinity ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 5 m but less than 6.5 m 3.5 m or less 6.5 m but less than 8 m 3.5 m but less than 5 m 5 m but less than 6.5 m 3.5 m or less 6.5 m but less than 8 m 3.5 m but less than 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The floor is rubbed with oxalic acid, for making its surface Durable Uniform Free from voids Glossy Durable Uniform Free from voids Glossy ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Crown and springing line Intrados and extrados Crown and ground level Ground level and springing line Crown and springing line Intrados and extrados Crown and ground level Ground level and springing line ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Strut Batten Cleat Purlin Strut Batten Cleat Purlin ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as Spandril Skewbacks Haunch Voussoirs Spandril Skewbacks Haunch Voussoirs ANSWER DOWNLOAD EXAMIANS APP