Building Construction The construction joints in buildings are provided after 15 m 10 m 20 m 40 m 15 m 10 m 20 m 40 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 5 3 6 4 5 3 6 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Suitable spacing of timber piles, is 70 cm 80 cm 90 cm 100 cm 70 cm 80 cm 90 cm 100 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act At the centre of the base Neither (A), (B) nor (C) Within the middle fifth of the base Within the middle third of the base At the centre of the base Neither (A), (B) nor (C) Within the middle fifth of the base Within the middle third of the base ANSWER DOWNLOAD EXAMIANS APP
Building Construction Queen closer may be placed In header course next to first brick In stretcher course In header course In stretcher course next to first brick In header course next to first brick In stretcher course In header course In stretcher course next to first brick ANSWER DOWNLOAD EXAMIANS APP
Building Construction Gravels All listed here Vary in size between 2 to 20 mm Never swell when they come into contact with water Are cohesionless aggregates All listed here Vary in size between 2 to 20 mm Never swell when they come into contact with water Are cohesionless aggregates ANSWER DOWNLOAD EXAMIANS APP