Building Construction The construction joints in buildings are provided after 20 m 15 m 10 m 40 m 20 m 15 m 10 m 40 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a wall carrying heavy load on low bearing capacity soil, Lean concrete bed is provided Reinforced concrete bed is provided Thick concrete bed is provided Both (A) and (C) of the above Lean concrete bed is provided Reinforced concrete bed is provided Thick concrete bed is provided Both (A) and (C) of the above ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Easy to handle Extremely durable All of these Lighter in weight Easy to handle Extremely durable All of these Lighter in weight ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Ornamental moulded course placed on the top of a wall, is Coping Frieze Cornice Lintel Coping Frieze Cornice Lintel ANSWER DOWNLOAD EXAMIANS APP
Building Construction The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than The column spacing One-third the column spacing Half the column spacing Three-fourth the column spacing The column spacing One-third the column spacing Half the column spacing Three-fourth the column spacing ANSWER DOWNLOAD EXAMIANS APP