Building Construction The construction joints in buildings are provided after 40 m 20 m 10 m 15 m 40 m 20 m 10 m 15 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The range of spread from the wall base to outer edge of a brick work foundation does not exceed 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 2 horizontals to 1 vertical 1 horizontal to 1 vertical 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 2 horizontals to 1 vertical 1 horizontal to 1 vertical ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is 10 cm 15 cm 20 cm 25 cm 10 cm 15 cm 20 cm 25 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Dubbing Blistering Hacking Peeling Dubbing Blistering Hacking Peeling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 14 days 7 days 3 days 21 days 14 days 7 days 3 days 21 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.557 a d = 0.445 a None of these d = 0.775 a d = 0.557 a d = 0.445 a None of these d = 0.775 a ANSWER DOWNLOAD EXAMIANS APP