Building Construction The construction joints in buildings are provided after 40 m 10 m 20 m 15 m 40 m 10 m 20 m 15 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 in 5 1 to 50 1 in 10 1 in 20 1 in 5 1 to 50 1 in 10 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Balusters Balustrades Newel posts Railings Balusters Balustrades Newel posts Railings ANSWER DOWNLOAD EXAMIANS APP
Building Construction Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to 1/4 2 1 1/2 1/4 2 1 1/2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 25 mm 25 to 40 mm 65 to 100 mm 40 to 65 mm 25 mm 25 to 40 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Breast wall Parapet wall Buttress Retaining wall Breast wall Parapet wall Buttress Retaining wall ANSWER DOWNLOAD EXAMIANS APP