The foundation in which a cantilever beam is provided to join two footings, is known as

Raft footing
Combined footing
Strap footing
Strip footing

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of multi-storeyed buildings, the forms to be removed first are

All the above at the same time
Column forms
Sides of beams and girders
Bottom of beams and girders

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form Work including the props can be removed from beams, only after

3 days
7 days
21 days
14 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is

1.35 du
1.75 du
1.25 du
1.5 du

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The Auger borings are not common

In cohesive soils
In soft soils
In soils that require lateral support
None of these

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The bearing capacity of a water logged soil can be improved by

Draining the soil
Grouting
Compacting the soil
Increasing the depth of foundation

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑