Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Combined footing Strap footing Raft footing Strip footing Combined footing Strap footing Raft footing Strip footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Stretcher Closer Header Bat Stretcher Closer Header Bat ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 1 meter 4 meters 2 meters 3 meters 1 meter 4 meters 2 meters 3 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than h/4 2 h h 1/2h h/4 2 h h 1/2h ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Chip floor Reinforced marble floor Terrazzo floor Marble floor Chip floor Reinforced marble floor Terrazzo floor Marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The projections of head or sill of a door or window frame are Chocks Horns Stops Transoms Chocks Horns Stops Transoms ANSWER DOWNLOAD EXAMIANS APP