Building Construction

Building Construction
The foundation in which a cantilever beam is provided to join two footings, is known as

Raft footing
Strap footing
Combined footing
Strip footing

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is

5, 4, 3, 2, 1
2, 1, 3, 5, 4
3, 2, 5, 1, 4
1, 2, 3, 4, 5

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The raft slab is projected beyond the outer walls of the structure by

5 to 10 cm
15 to 20 cm
25 to 30 cm
30 to 45 cm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Pile foundation is generally provided if soil is

Compressible
All listed here
Made up
Water logged

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In the construction of arches, sand box method is used for

Centring
Striking of centring
None of these
Actual laying of arch work

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The angle between skew back of a flat arch and the horizontal, is kept approximately equal to

60°
90°
30°
0°

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑