Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Combined footing Raft footing Strip footing Strap footing Combined footing Raft footing Strip footing Strap footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 12 18 24 25 12 18 24 25 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which supports the load partly by friction and partly by resting on hard stratum, is called Friction bearing pile Rough pile Friction pile Bearing pile Friction bearing pile Rough pile Friction pile Bearing pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Best type of piles for soft soil having little resistance to the flow of concrete, is Raymond pile Simplex pile Vibro pile Franki pile Raymond pile Simplex pile Vibro pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados None of these Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept Equal to its projection beyond wall base 10 cm 15 cm Less than its projection beyond wall base Equal to its projection beyond wall base 10 cm 15 cm Less than its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP