Building Construction The minimum width of a stair in residential buildings, is 70 cm 55 cm 100 cm 85 cm 70 cm 55 cm 100 cm 85 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Nogging of a common wooden partition is Upper horizontal wooden member Intermediate horizontal wooden member Vertical wooden member Lower horizontal wooden member Upper horizontal wooden member Intermediate horizontal wooden member Vertical wooden member Lower horizontal wooden member ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided in flat roof of a room, is known Lantern window Louvered window Sky window Dormer window Lantern window Louvered window Sky window Dormer window ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 70 1 in 50 1 in 60 1 in 40 1 in 70 1 in 50 1 in 60 1 in 40 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Watering surface of soil Ramming crushed stone in soil Draining sub-soil water Driving sand piles Watering surface of soil Ramming crushed stone in soil Draining sub-soil water Driving sand piles ANSWER DOWNLOAD EXAMIANS APP