Building Construction In which of the following pairs both trees yield soft wood? Chir and deodar Sal and teak Chir and sal Deodar and Shishum Chir and deodar Sal and teak Chir and sal Deodar and Shishum ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 40 m 15 m 10 m 20 m 40 m 15 m 10 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Parapet wall Breast wall Retaining wall Buttress Parapet wall Breast wall Retaining wall Buttress ANSWER DOWNLOAD EXAMIANS APP
Building Construction Mansard roof is a roof which slopes in Two directions without break in the slope on each side Two directions with break in the slope on each side Four directions without break in the slope on each side Four directions with break in the slope on each side Two directions without break in the slope on each side Two directions with break in the slope on each side Four directions without break in the slope on each side Four directions with break in the slope on each side ANSWER DOWNLOAD EXAMIANS APP
Building Construction The columns of multi-storeyed buildings are designed to withstand the forces due to All of these Live loads Wind loads Dead loads All of these Live loads Wind loads Dead loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Under pinning Scaffolding Raking shore Dead shore Under pinning Scaffolding Raking shore Dead shore ANSWER DOWNLOAD EXAMIANS APP