Building Construction In which of the following pairs both trees yield soft wood? Deodar and Shishum Chir and deodar Sal and teak Chir and sal Deodar and Shishum Chir and deodar Sal and teak Chir and sal ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept 10 cm Less than its projection beyond wall base Equal to its projection beyond wall base 15 cm 10 cm Less than its projection beyond wall base Equal to its projection beyond wall base 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for columns, is 50 to 100 mm 25 to 50 mm 25 to 75 mm 75 to 125 mm 50 to 100 mm 25 to 50 mm 25 to 75 mm 75 to 125 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 1 day 14 days 4 days 7 days 1 day 14 days 4 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/6th of the span 1/10th of the span 1/12th of the span 1/8th of the span 1/6th of the span 1/10th of the span 1/12th of the span 1/8th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Lantern window Dormer window Louvered window Rash window Lantern window Dormer window Louvered window Rash window ANSWER DOWNLOAD EXAMIANS APP