Building Construction A solid core of rock is formed inside the cylinder in the case of Auger boring Diamond drilling Wash boring Percussion drilling Auger boring Diamond drilling Wash boring Percussion drilling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Post Style Reveal Mullion Post Style Reveal Mullion ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction To obtain good bonding in brick masonry Vertical joints in alternate courses are kept in plumb line Bats are used where necessary First class bricks are used All of these Vertical joints in alternate courses are kept in plumb line Bats are used where necessary First class bricks are used All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called Stretcher bond Header bond English bond Flemish bond Stretcher bond Header bond English bond Flemish bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction Negative skin friction Develops due to lowering of ground water Neither (A) not (B) Both (A) and (B) Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Develops due to lowering of ground water Neither (A) not (B) Both (A) and (B) Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile ANSWER DOWNLOAD EXAMIANS APP