Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 25 % 15 % 20 % 10 % 25 % 15 % 20 % 10 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Franki pile Mac-Arthur pile Raymond pile Simplex pile Franki pile Mac-Arthur pile Raymond pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 1 day 7 days 4 days 14 days 1 day 7 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The local swelling of a finished plaster, is termed Cracking Dubbing Blistering Hacking Cracking Dubbing Blistering Hacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Centring Striking of centring Actual laying of arch work None of these Centring Striking of centring Actual laying of arch work None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of concrete bed of the foundation depends upon The upward soil pressure The projection of the concrete block beyond the footing over it All listed here The mix of the concrete The upward soil pressure The projection of the concrete block beyond the footing over it All listed here The mix of the concrete ANSWER DOWNLOAD EXAMIANS APP