Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 20 % 15 % 25 % 10 % 20 % 15 % 25 % 10 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados Vertical distance between springing line and intrados None of these Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados Vertical distance between springing line and intrados None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 in 20 1 in 10 1 in 5 1 to 50 1 in 20 1 in 10 1 in 5 1 to 50 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which a V-shaped projection outside the wall surface, is provided, is called Weather pointing V-pointing Tuck pointing Recessed pointing Weather pointing V-pointing Tuck pointing Recessed pointing ANSWER DOWNLOAD EXAMIANS APP
Building Construction In high mountainous region, the type of roof generally recommended for buildings, is Gambrel type Gable type Mansard type Shed type Gambrel type Gable type Mansard type Shed type ANSWER DOWNLOAD EXAMIANS APP
Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Eccentric piles Raking piles Sinking piles Construction piles Eccentric piles Raking piles Sinking piles Construction piles ANSWER DOWNLOAD EXAMIANS APP