Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 25 % 15 % 10 % 20 % 25 % 15 % 10 % 20 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction In English garden wall bond The middle course of stretchers is started with a header to give proper vertical joints One course of headers to three or five course of stretchers Queen closer in provided in each heading course All of these The middle course of stretchers is started with a header to give proper vertical joints One course of headers to three or five course of stretchers Queen closer in provided in each heading course All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling All listed here Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm All listed here Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Herringbone bond is used for All of these Ornamental panels in brick flooring Architectural finish to the face work Walls having thickness more than 4 bricks All of these Ornamental panels in brick flooring Architectural finish to the face work Walls having thickness more than 4 bricks ANSWER DOWNLOAD EXAMIANS APP
Building Construction Single Flemish bond consists of Double Flemish bond facing and English bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Stretcher bond facing and double Flemish bond backing in each course ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 300 to 350 mm 600 to 650 mm 400 to 450 mm 500 to 550 mm 300 to 350 mm 600 to 650 mm 400 to 450 mm 500 to 550 mm ANSWER DOWNLOAD EXAMIANS APP