Building Construction Pick up the correct statements from the following: All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Cracks appear on the plastered surface in the form of hair cracks Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Cracks appear on the plastered surface in the form of hair cracks Excessive thermal variations in the backing or plaster causes the plaster to fall ANSWER DOWNLOAD EXAMIANS APP
Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Dead shore Raking shore Under pinning Scaffolding Dead shore Raking shore Under pinning Scaffolding ANSWER DOWNLOAD EXAMIANS APP
Building Construction The horizontal timber piece provided at the apex of a roof truss which supports the common rafter is called Eaves board Hip rafter Ridge board Valley rafter Eaves board Hip rafter Ridge board Valley rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone masonry of finely dressed stones laid in cement or lime, is Random rubble masonry Dry rubble masonry Coursed rubble masonry Ashlar masonry Random rubble masonry Dry rubble masonry Coursed rubble masonry Ashlar masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pitched and sloping roofs are suitable for Covering large areas Coastal regions Plain regions All of these Covering large areas Coastal regions Plain regions All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is 4 cm 2 cm 6 cm 8 cm 4 cm 2 cm 6 cm 8 cm ANSWER DOWNLOAD EXAMIANS APP