Building Construction An arch may fail due to Crushing of the material All listed here Uneven settlement of abutments Sliding of voussoirs Crushing of the material All listed here Uneven settlement of abutments Sliding of voussoirs ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wooden block hinged on post outside a door, is known Stop Cleat Horn None of these Stop Cleat Horn None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The floor is rubbed with oxalic acid, for making its surface Uniform Free from voids Glossy Durable Uniform Free from voids Glossy Durable ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statements from the following: Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here Cracks appear on the plastered surface in the form of hair cracks In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here Cracks appear on the plastered surface in the form of hair cracks In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water ANSWER DOWNLOAD EXAMIANS APP
Building Construction The taper of precast concrete pile should not be more than 5 cm per metre length 1 cm per metre length 2 cm per metre length 4 cm per metre length 5 cm per metre length 1 cm per metre length 2 cm per metre length 4 cm per metre length ANSWER DOWNLOAD EXAMIANS APP