Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 5 6 4 3 5 6 4 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Dubbing out Floating Blistering Knitting Dubbing out Floating Blistering Knitting ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Valley Hip None of these Ridge Valley Hip None of these Ridge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The function of king post in a king post roof truss is To prevent the tie beam from sagging at its centre To support the frame work of the roof To prevent the walls from spreading outward To receive the ends of principal rafter To prevent the tie beam from sagging at its centre To support the frame work of the roof To prevent the walls from spreading outward To receive the ends of principal rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statement about silt soil from the following: All listed here In organic fine grained silt soil possesses no plasticity The silt soil has particle size from 0.02 mm to 0.06 mm The least plastic type normally consists of more or less equidimensional grains of quartz All listed here In organic fine grained silt soil possesses no plasticity The silt soil has particle size from 0.02 mm to 0.06 mm The least plastic type normally consists of more or less equidimensional grains of quartz ANSWER DOWNLOAD EXAMIANS APP
Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Ground level Plinth level Water table level Midway ground level and water-table level Ground level Plinth level Water table level Midway ground level and water-table level ANSWER DOWNLOAD EXAMIANS APP