Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 4 5 6 3 4 5 6 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of piles is determined by Dynamic formula Pile load tests All of these Static formula Dynamic formula Pile load tests All of these Static formula ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of Raymond pile All listed here Lengths vary from 6 m to 12 m Diameter of pile at bottom varies from 20 cm to 28 cm Diameter of top of piles varies from 40 cm to 60 cm All listed here Lengths vary from 6 m to 12 m Diameter of pile at bottom varies from 20 cm to 28 cm Diameter of top of piles varies from 40 cm to 60 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Chip floor Reinforced marble floor Marble floor Terrazzo floor Chip floor Reinforced marble floor Marble floor Terrazzo floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Post Style Reveal Mullion Post Style Reveal Mullion ANSWER DOWNLOAD EXAMIANS APP
Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Raft footing Combined footing Strap footing Pier footing Raft footing Combined footing Strap footing Pier footing ANSWER DOWNLOAD EXAMIANS APP