Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 6 5 3 4 6 5 3 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In any good staircase, the maximum and minimum pitch respectively should be 40° and 25° 90° and 0° 60° and 10° 75° and 30° 40° and 25° 90° and 0° 60° and 10° 75° and 30° ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Multi-storeyed buildings Compact soils Water logged soils Soft rocks Multi-storeyed buildings Compact soils Water logged soils Soft rocks ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 300 to 350 mm 500 to 550 mm 600 to 650 mm 400 to 450 mm 300 to 350 mm 500 to 550 mm 600 to 650 mm 400 to 450 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of Raymond pile All listed here Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m Diameter of pile at bottom varies from 20 cm to 28 cm All listed here Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m Diameter of pile at bottom varies from 20 cm to 28 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A covering of concrete placed on the exposed top of an external wall, is known as Cornice Coping Lintel Frieze Cornice Coping Lintel Frieze ANSWER DOWNLOAD EXAMIANS APP