Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 4 6 5 3 4 6 5 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger borings are not common None of these In soils that require lateral support In soft soils In cohesive soils None of these In soils that require lateral support In soft soils In cohesive soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Knitting Blistering Dubbing out Floating Knitting Blistering Dubbing out Floating ANSWER DOWNLOAD EXAMIANS APP
Building Construction The size of a floor tile commonly used, is 22.5 × 22.5 cm × 2.2 cm 20 cm × 20 cm × 2 cm All listed here 15 cm × 15 cm × 1.8 cm 22.5 × 22.5 cm × 2.2 cm 20 cm × 20 cm × 2 cm All listed here 15 cm × 15 cm × 1.8 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The range of spread from the wall base to outer edge of a brick work foundation does not exceed 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 1 horizontal to 1 vertical 2 horizontals to 1 vertical 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 1 horizontal to 1 vertical 2 horizontals to 1 vertical ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 5 3 No limit 2 5 3 No limit 2 ANSWER DOWNLOAD EXAMIANS APP