Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 6 3 5 4 6 3 5 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Mac-Arthur pile Raymond pile Simplex pile Franki pile Mac-Arthur pile Raymond pile Simplex pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dampness causes Efflorescence Crumbling of plaster Bleaching of paints Growth of termites Efflorescence Crumbling of plaster Bleaching of paints Growth of termites ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Balusters Newel posts Railings Balustrades Balusters Newel posts Railings Balustrades ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile provided with one or more bulles in its vertical shaft, is generally known as Bearing pile Sheet pile Under-ream pile Friction pile Bearing pile Sheet pile Under-ream pile Friction pile ANSWER DOWNLOAD EXAMIANS APP