Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 6 5 3 4 6 5 3 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm All listed here Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of roof suitable in plains where rainfall is meagre and temperature is high is Flat roof Shell roof None of these Pitched and sloping roof Flat roof Shell roof None of these Pitched and sloping roof ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its length parallel to the face of a wall, is a known as Stretcher None of these Closer Header Stretcher None of these Closer Header ANSWER DOWNLOAD EXAMIANS APP
Building Construction A solid core of rock is formed inside the cylinder in the case of Percussion drilling Wash boring Auger boring Diamond drilling Percussion drilling Wash boring Auger boring Diamond drilling ANSWER DOWNLOAD EXAMIANS APP
Building Construction In clay soil Consolidation continues even after several years of construction All listed here Swelling and shrinkage characteristics prevail Differential settlement is generally prevalent Consolidation continues even after several years of construction All listed here Swelling and shrinkage characteristics prevail Differential settlement is generally prevalent ANSWER DOWNLOAD EXAMIANS APP