If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is

5
4
6
3

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The vertical member running through middle of a shutter frame, is

Post
Reveal
Mullion
Style

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The minimum depth of foundation in clayey soils is

0.7 m
0.5 m
1.2 m
0.9 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Raft foundation are generally preferred to when the area required for individual footing, is more than

40% to total area
25% to total area
30% of total area
50% of total area

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Depth of lean concrete bed placed at the bottom of a wall footing, is kept

Equal to its projection beyond wall base
15 cm
Less than its projection beyond wall base
10 cm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The pile provided with one or more bulles in its vertical shaft, is generally known as

Bearing pile
Sheet pile
Under-ream pile
Friction pile

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑