Building Construction

Building Construction
If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is

4
6
3
5

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The members which support covering material of a sloping roof, are

Struts
Battens
Purlins
Rafters

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed

20 m
15 m
10 m
5 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The depth of concrete bed of the foundation depends upon

The projection of the concrete block beyond the footing over it
The upward soil pressure
The mix of the concrete
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The inner section of a cavity wall, is generally known as

Pilaster
Leaf wall
Buttress
Pillar

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
If (φ) is the angle of repose of soil of weight w kg/m3, the horizontal pressure p at a depth of h meters per metre length of wall, is

(wh/2) × [(1 - sin φ)/(1 + sin φ)]
wh × √[(1 - sin φ)/(1 + sin φ)]
wh × √[(1 + sin φ)/(1 - sin φ)]
wh × [(1 - sin φ)/(1 + sin φ)]

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑