Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 4 6 3 5 4 6 3 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 7 days 14 days 4 days 1 day 7 days 14 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to English bond, double Flemish bond is None of these Costly More compact Stronger None of these Costly More compact Stronger ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Water logged soils Soft rocks Multi-storeyed buildings Compact soils Water logged soils Soft rocks Multi-storeyed buildings Compact soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction In English garden wall bond One course of headers to three or five course of stretchers Queen closer in provided in each heading course All of these The middle course of stretchers is started with a header to give proper vertical joints One course of headers to three or five course of stretchers Queen closer in provided in each heading course All of these The middle course of stretchers is started with a header to give proper vertical joints ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to Rankine's formula, minimum depth of foundations, is (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] ANSWER DOWNLOAD EXAMIANS APP