Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 4 5 6 3 4 5 6 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 40 mm 65 mm 25 mm 100 mm 40 mm 65 mm 25 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A cut in frame of a door to receive the shutter, is called Stop Louver Horn Rebate Stop Louver Horn Rebate ANSWER DOWNLOAD EXAMIANS APP
Building Construction The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called Brick on end Brick on bed Brick held vertically Brick on edge Brick on end Brick on bed Brick held vertically Brick on edge ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct specification of one-room quarters generally adopted from the following: The front verandah is kept 2 m wide The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m All listed here Six quarters in a row The front verandah is kept 2 m wide The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m All listed here Six quarters in a row ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on black cotton soils, the most suitable method to increase the bearing capacity of soils is to Compact the soil Drain the soil Replace the poor soil Increase the depth of foundation Compact the soil Drain the soil Replace the poor soil Increase the depth of foundation ANSWER DOWNLOAD EXAMIANS APP