Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 5 6 3 4 5 6 3 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Chips floor Terrazzo floor Mosaic floor Marble floor Chips floor Terrazzo floor Mosaic floor Marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone whose crushing strength is least, is Marble Granite Slate Chalk Marble Granite Slate Chalk ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 65 mm 100 mm 40 mm 25 mm 65 mm 100 mm 40 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 5 2 3 No limit 5 2 3 No limit ANSWER DOWNLOAD EXAMIANS APP
Building Construction The columns of multi-storeyed buildings are designed to withstand the forces due to Live loads All of these Wind loads Dead loads Live loads All of these Wind loads Dead loads ANSWER DOWNLOAD EXAMIANS APP