Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept Equal to its projection beyond wall base 10 cm Less than its projection beyond wall base 15 cm Equal to its projection beyond wall base 10 cm Less than its projection beyond wall base 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which supports the load partly by friction and partly by resting on hard stratum, is called Bearing pile Friction pile Rough pile Friction bearing pile Bearing pile Friction pile Rough pile Friction bearing pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum bearing capacity of soil is that of Loose fine sandy soil Dry coarse sandy soil Hard rocks Black cotton soil Loose fine sandy soil Dry coarse sandy soil Hard rocks Black cotton soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Valley Hip Ridge None of these Valley Hip Ridge None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 7 days 4 days 1 day 14 days 7 days 4 days 1 day 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Ornamental moulded course placed on the top of a wall, is Lintel Frieze Cornice Coping Lintel Frieze Cornice Coping ANSWER DOWNLOAD EXAMIANS APP