Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept 10 cm 15 cm Equal to its projection beyond wall base Less than its projection beyond wall base 10 cm 15 cm Equal to its projection beyond wall base Less than its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 25 mm 65 to 100 mm 40 to 65 mm 25 to 40 mm 25 mm 65 to 100 mm 40 to 65 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Stretcher Bat Header Closer Stretcher Bat Header Closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be Equal to width of stairs One fourth the width of stairs Twice the width of stairs Half the width of stairs Equal to width of stairs One fourth the width of stairs Twice the width of stairs Half the width of stairs ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 7 days 21 days 3 days 14 days 7 days 21 days 3 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone blocks approximately triangular in shape, used as steps, are known Built up steps None of these Spandril steps Stone steps Built up steps None of these Spandril steps Stone steps ANSWER DOWNLOAD EXAMIANS APP