Building Construction

Building Construction
The stone blocks approximately triangular in shape, used as steps, are known

Built up steps
None of these
Stone steps
Spandril steps

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to

20 mm
30 mm
10 mm
40 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the sides of beams can be removed only after

1 day
14 days
4 days
7 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
An arch may fail due to

Crushing of the material
Sliding of voussoirs
Uneven settlement of abutments
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The local swelling of a finished plaster, is termed

Cracking
Blistering
Dubbing
Hacking

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The lintels are preferred to arches because

Arches require more headroom to span the openings like doors, windows etc.
Arches require strong abutments to withstand arch thrust
All of these
Arches are difficult in construction

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑