Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 25 to 40 mm 25 mm 65 to 100 mm 40 to 65 mm 25 to 40 mm 25 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone blocks approximately triangular in shape, used as steps, are known None of these Spandril steps Built up steps Stone steps None of these Spandril steps Built up steps Stone steps ANSWER DOWNLOAD EXAMIANS APP
Building Construction The floor is rubbed with oxalic acid, for making its surface Durable Uniform Glossy Free from voids Durable Uniform Glossy Free from voids ANSWER DOWNLOAD EXAMIANS APP
Building Construction Queen closer may be placed In header course next to first brick In header course In stretcher course next to first brick In stretcher course In header course next to first brick In header course In stretcher course next to first brick In stretcher course ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of English bond Single Flemish bond Header bond Stretcher bond English bond Single Flemish bond Header bond Stretcher bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Style Reveal Post Mullion Style Reveal Post Mullion ANSWER DOWNLOAD EXAMIANS APP