Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 mm 40 to 65 mm 25 to 40 mm 65 to 100 mm 25 mm 40 to 65 mm 25 to 40 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Column forms Bottom of beams and girders Sides of beams and girders All the above at the same time Column forms Bottom of beams and girders Sides of beams and girders All the above at the same time ANSWER DOWNLOAD EXAMIANS APP
Building Construction The members which support covering material of a sloping roof, are Battens Struts Purlins Rafters Battens Struts Purlins Rafters ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 4 1 : 1 1 : 2 1 : 3 1 : 4 1 : 1 1 : 2 1 : 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Expansion joints in masonry walls are provided if length exceeds 40 m 30 m 20 m 10 m 40 m 30 m 20 m 10 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for columns, is 75 to 125 mm 50 to 100 mm 25 to 75 mm 25 to 50 mm 75 to 125 mm 50 to 100 mm 25 to 75 mm 25 to 50 mm ANSWER DOWNLOAD EXAMIANS APP