Building Construction An ordinary concrete may be made water proof by adding All of these Snowcem Pudlo Impermo All of these Snowcem Pudlo Impermo ANSWER DOWNLOAD EXAMIANS APP
Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Strap footing Pier footing Combined footing Raft footing Strap footing Pier footing Combined footing Raft footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as Queen closer Half king closer King closer Bevelled closer Queen closer Half king closer King closer Bevelled closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is Struck pointing Truck pointing Recessed pointing Grooved pointing Struck pointing Truck pointing Recessed pointing Grooved pointing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 Distance of All listed here The length of the foundation slab = 7.00 m G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 Distance of All listed here The length of the foundation slab = 7.00 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 ANSWER DOWNLOAD EXAMIANS APP