Building Construction The process of making the back ground rough, before plastering, is Dubbing Hacking Peeling Blistering Dubbing Hacking Peeling Blistering ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 7 days 1 day 4 days 14 days 7 days 1 day 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Slate Has a smooth surface and contains alumina and silica Possesses good water absorption capacity Splits into thin sheets along its bedding planes Is a metamorphic rock Has a smooth surface and contains alumina and silica Possesses good water absorption capacity Splits into thin sheets along its bedding planes Is a metamorphic rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction The size of a floor tile commonly used, is All listed here 20 cm × 20 cm × 2 cm 15 cm × 15 cm × 1.8 cm 22.5 × 22.5 cm × 2.2 cm All listed here 20 cm × 20 cm × 2 cm 15 cm × 15 cm × 1.8 cm 22.5 × 22.5 cm × 2.2 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a wall carrying heavy load on low bearing capacity soil, Both (A) and (C) of the above Thick concrete bed is provided Reinforced concrete bed is provided Lean concrete bed is provided Both (A) and (C) of the above Thick concrete bed is provided Reinforced concrete bed is provided Lean concrete bed is provided ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which supports the load partly by friction and partly by resting on hard stratum, is called Friction bearing pile Friction pile Bearing pile Rough pile Friction bearing pile Friction pile Bearing pile Rough pile ANSWER DOWNLOAD EXAMIANS APP