Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act Neither (A), (B) nor (C) Within the middle fifth of the base At the centre of the base Within the middle third of the base Neither (A), (B) nor (C) Within the middle fifth of the base At the centre of the base Within the middle third of the base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The columns of multi-storeyed buildings are designed to withstand the forces due to Live loads Wind loads All of these Dead loads Live loads Wind loads All of these Dead loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction To construct a 10 cm thick partition wall, you will prefer English bond Flemish bond Stretcher bond Header bond English bond Flemish bond Stretcher bond Header bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Strut Batten Purlin Cleat Strut Batten Purlin Cleat ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 300 to 350 mm 500 to 550 mm 400 to 450 mm 600 to 650 mm 300 to 350 mm 500 to 550 mm 400 to 450 mm 600 to 650 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 20 m 40 m 10 m 15 m 20 m 40 m 10 m 15 m ANSWER DOWNLOAD EXAMIANS APP