Building Construction
To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act

Within the middle fifth of the base
At the centre of the base
Neither (A), (B) nor (C)
Within the middle third of the base

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Which one of the following activities is not correct as applicable to brick corbels

The maximum projection of the corbel should not be more than the thickness of the wall
The discontinuous corbels are used to carry heavy concentrated loads
The maximum projection of each corbel course should be limited to a quarter brick at a time
Stretcher bond is generally used for the construction of brick corbel

ANSWER DOWNLOAD EXAMIANS APP