Building Construction As compared to English bond, double Flemish bond is Costly None of these More compact Stronger Costly None of these More compact Stronger ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: Distance of C.G. of the loads from the smaller column = 3.00 m All listed here Area of footing slab = 11.00 m2 The length of the foundation slab = 7.00 m Distance of C.G. of the loads from the smaller column = 3.00 m All listed here Area of footing slab = 11.00 m2 The length of the foundation slab = 7.00 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as English cross bond Monk bond Rat-trap bond Dutch bond English cross bond Monk bond Rat-trap bond Dutch bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil, may be improved by Compaction Drainage Chemical action Grouting Compaction Drainage Chemical action Grouting ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called Topping Screeding Bedding None of these Topping Screeding Bedding None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction During percussion drilling Caving or mixing of strata are caused in soft soils or cohesion-less soils All listed here Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole The soil to a considerable depth below the bottom of the hole gets disturbed Caving or mixing of strata are caused in soft soils or cohesion-less soils All listed here Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole The soil to a considerable depth below the bottom of the hole gets disturbed ANSWER DOWNLOAD EXAMIANS APP