Building Construction The nominal thickness of one brick wall in mm, is 200 mm 150 mm 190 mm 90 mm 200 mm 150 mm 190 mm 90 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Draining sub-soil water Driving sand piles Watering surface of soil Ramming crushed stone in soil Draining sub-soil water Driving sand piles Watering surface of soil Ramming crushed stone in soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Marble floor Chip floor Terrazzo floor Reinforced marble floor Marble floor Chip floor Terrazzo floor Reinforced marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The taper of precast concrete pile should not be more than 2 cm per metre length 1 cm per metre length 5 cm per metre length 4 cm per metre length 2 cm per metre length 1 cm per metre length 5 cm per metre length 4 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction Raft foundation are generally preferred to when the area required for individual footing, is more than 50% of total area 25% to total area 40% to total area 30% of total area 50% of total area 25% to total area 40% to total area 30% of total area ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is None of these Ridge Hip Valley None of these Ridge Hip Valley ANSWER DOWNLOAD EXAMIANS APP