Building Construction A cut in frame of a door to receive the shutter, is called Stop Horn Louver Rebate Stop Horn Louver Rebate ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of two surfaces of a sloping roof forming an internal angle less than 180°, is known as None of these Ridge Hip Valley None of these Ridge Hip Valley ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called Bevelled closer King closer Half brick Queen closer Bevelled closer King closer Half brick Queen closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: Distance of C.G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 All listed here The length of the foundation slab = 7.00 m Distance of C.G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 All listed here The length of the foundation slab = 7.00 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Best type of piles for soft soil having little resistance to the flow of concrete, is Vibro pile Raymond pile Franki pile Simplex pile Vibro pile Raymond pile Franki pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 2 1 : 6 1 : 4 1 : 3 1 : 2 1 : 6 1 : 4 1 : 3 ANSWER DOWNLOAD EXAMIANS APP