Building Construction To obtain good bonding in brick masonry Vertical joints in alternate courses are kept in plumb line First class bricks are used All of these Bats are used where necessary Vertical joints in alternate courses are kept in plumb line First class bricks are used All of these Bats are used where necessary ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Raft footing Strip footing Combined footing Strap footing Raft footing Strip footing Combined footing Strap footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum depth of foundation in clayey soils is 0.9 m 0.5 m 1.2 m 0.7 m 0.9 m 0.5 m 1.2 m 0.7 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of arch used for high class buildings where appearance is of prime importance, is known as Rubble arch Ashlar arch Axed brick arch Gauged brick arch Rubble arch Ashlar arch Axed brick arch Gauged brick arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone blocks approximately triangular in shape, used as steps, are known Built up steps Spandril steps None of these Stone steps Built up steps Spandril steps None of these Stone steps ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for foundations, is 25 to 50 mm 75 to 125 mm 50 to 100 mm 30 to 125 mm 25 to 50 mm 75 to 125 mm 50 to 100 mm 30 to 125 mm ANSWER DOWNLOAD EXAMIANS APP