Building Construction
To obtain good bonding in brick masonry

All of these
Vertical joints in alternate courses are kept in plumb line
Bats are used where necessary
First class bricks are used

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For constructing a terrazzo floor, Pick up the incorrect statement from the following:

After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material
A base course is prepared as in cement concrete flooring
A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling
Glass strips are driven into the layer according to the pattern required

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In English garden wall bond

All of these
Queen closer in provided in each heading course
One course of headers to three or five course of stretchers
The middle course of stretchers is started with a header to give proper vertical joints

ANSWER DOWNLOAD EXAMIANS APP