Building Construction The maximum bearing capacity of soil is that of Dry coarse sandy soil Hard rocks Black cotton soil Loose fine sandy soil Dry coarse sandy soil Hard rocks Black cotton soil Loose fine sandy soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: All listed here A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand All listed here A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 3.5 m but less than 5 m 5 m but less than 6.5 m 3.5 m or less 6.5 m but less than 8 m 3.5 m but less than 5 m 5 m but less than 6.5 m 3.5 m or less 6.5 m but less than 8 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 3, 2, 5, 1, 4 2, 1, 3, 5, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 3, 2, 5, 1, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The term string is used for A vertical member between two treads A sloping member which supports the steps in a stair The underside of a stair Outer projecting edge of a tread A vertical member between two treads A sloping member which supports the steps in a stair The underside of a stair Outer projecting edge of a tread ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 1 day 14 days 4 days 7 days 1 day 14 days 4 days ANSWER DOWNLOAD EXAMIANS APP