Building Construction The rock formed from the solidification of molten matter (magma) is called: None of these Metamorphic rock Sedimentary rock Igneous rock None of these Metamorphic rock Sedimentary rock Igneous rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to English bond, double Flemish bond is Costly Stronger More compact None of these Costly Stronger More compact None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum depth of foundation in clayey soils is 1.2 m 0.7 m 0.9 m 0.5 m 1.2 m 0.7 m 0.9 m 0.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 350 420 450 500 350 420 450 500 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for columns, is 25 to 50 mm 50 to 100 mm 75 to 125 mm 25 to 75 mm 25 to 50 mm 50 to 100 mm 75 to 125 mm 25 to 75 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical side member of a shutter frame, is known Reveal Post Style Mullion Reveal Post Style Mullion ANSWER DOWNLOAD EXAMIANS APP