Building Construction The rock formed from the solidification of molten matter (magma) is called: Sedimentary rock Metamorphic rock None of these Igneous rock Sedimentary rock Metamorphic rock None of these Igneous rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction The under surface of an arch, is called Intrados Soffit Back Haunch Intrados Soffit Back Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as Queen closer Bevelled closer King closer Half king closer Queen closer Bevelled closer King closer Half king closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Intrados Rise Spandril Extrados Intrados Rise Spandril Extrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Lighter in weight Easy to handle Extremely durable All of these Lighter in weight Easy to handle Extremely durable All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to National Building Code, the hydrants in water mains is provided at minimum interval of 75 m 50 m 90 m 60 m 75 m 50 m 90 m 60 m ANSWER DOWNLOAD EXAMIANS APP