Building Construction The arrangement made to support an unsafe structure temporarily, is known as Scaffolding Underpinning Jacking Shoring Scaffolding Underpinning Jacking Shoring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 20 mm 10 mm 40 mm 30 mm 20 mm 10 mm 40 mm 30 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following factors is considered for the orientation of buildings? All listed here The direction of the prevailing winds in the area The exposure of the walls and roof of the buildings to the rays of sun The extent up to which the sunrays penetrate with the verandah All listed here The direction of the prevailing winds in the area The exposure of the walls and roof of the buildings to the rays of sun The extent up to which the sunrays penetrate with the verandah ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Steel tape Levelling staff Ranging rod Boning rod Steel tape Levelling staff Ranging rod Boning rod ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to National Building Code, the hydrants in water mains is provided at minimum interval of 50 m 90 m 60 m 75 m 50 m 90 m 60 m 75 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Vibro pile Franki pile Pedestal pile Pressure pile Vibro pile Franki pile Pedestal pile Pressure pile ANSWER DOWNLOAD EXAMIANS APP