Building Construction

Building Construction
The raft slab is projected beyond the outer walls of the structure by

30 to 45 cm
15 to 20 cm
5 to 10 cm
25 to 30 cm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known

Eccentric piles
Construction piles
Sinking piles
Raking piles

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A pre-stressed concrete pile is

All of these
Lighter in weight
Easy to handle
Extremely durable

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Pile foundation is generally provided if soil is

Made up
Compressible
Water logged
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed

20 m
15 m
10 m
5 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum bearing capacity of soil is that of

Hard rocks
Dry coarse sandy soil
Black cotton soil
Loose fine sandy soil

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑