Building Construction For a wall carrying heavy load on low bearing capacity soil, Lean concrete bed is provided Thick concrete bed is provided Both (A) and (C) of the above Reinforced concrete bed is provided Lean concrete bed is provided Thick concrete bed is provided Both (A) and (C) of the above Reinforced concrete bed is provided ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Chips floor Mosaic floor Terrazzo floor Marble floor Chips floor Mosaic floor Terrazzo floor Marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Post Mullion Reveal Style Post Mullion Reveal Style ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 21 days 7 days 14 days 3 days 21 days 7 days 14 days 3 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for beams and slabs; is 25 to 50 mm 50 to 100 mm 30 to 125 mm 25 to 75 mm 25 to 50 mm 50 to 100 mm 30 to 125 mm 25 to 75 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.445 a d = 0.557 a d = 0.775 a None of these d = 0.445 a d = 0.557 a d = 0.775 a None of these ANSWER DOWNLOAD EXAMIANS APP