Building Construction For brick construction, the lime-sand mortar, is 1 : 2 1 : 4 1 : 3 1 : 1 1 : 2 1 : 4 1 : 3 1 : 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the consideration to the taken while designing a hospital from the following: The operation theater unit to be detached as it requires sterilized zone but near the ward for the patients and doctor Casualty unit should be provided a separate entrance All listed here The mortuary should be detached from the main circulation with a post-mortem room The operation theater unit to be detached as it requires sterilized zone but near the ward for the patients and doctor Casualty unit should be provided a separate entrance All listed here The mortuary should be detached from the main circulation with a post-mortem room ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados Vertical distance between springing line and intrados None of these Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados Vertical distance between springing line and intrados None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Lintel Perpend Bed block Vertical line Lintel Perpend Bed block Vertical line ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 35 mm 45 mm 15 mm 25 mm 35 mm 45 mm 15 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 14 days 4 days 1 day 7 days 14 days 4 days 1 day ANSWER DOWNLOAD EXAMIANS APP