Building Construction For brick construction, the lime-sand mortar, is 1 : 3 1 : 2 1 : 1 1 : 4 1 : 3 1 : 2 1 : 1 1 : 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Brick nogging type of partition wall, is constructed by Constructing brick work within a wooden framework Laying bricks as headers in cement mortar Laying bricks as stretchers in cement mortar Reinforcing brick wall with iron straps Constructing brick work within a wooden framework Laying bricks as headers in cement mortar Laying bricks as stretchers in cement mortar Reinforcing brick wall with iron straps ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 3, 2, 5, 1, 4 2, 1, 3, 5, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 3, 2, 5, 1, 4 2, 1, 3, 5, 4 5, 4, 3, 2, 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wall constructed to resist the pressure of an earth filling, is called Buttress Retaining wall Parapet wall Breast wall Buttress Retaining wall Parapet wall Breast wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Floating Knitting Blistering Dubbing out Floating Knitting Blistering Dubbing out ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the None of these Vertical distance between springing line and intrados Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados None of these Vertical distance between springing line and intrados Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados ANSWER DOWNLOAD EXAMIANS APP