Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.5 du 1.35 du 1.25 du 1.75 du 1.5 du 1.35 du 1.25 du 1.75 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical sides of a door and window openings provided in a wall, are known as None of these Reveals Verticals Jambs None of these Reveals Verticals Jambs ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling Is not suitable for deposits containing very coarse gravel All listed here Is not economical for holes of less than 10 cm Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel All listed here Is not economical for holes of less than 10 cm Hinders the ground water observations and permeability test ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 500 to 550 mm 300 to 350 mm 400 to 450 mm 600 to 650 mm 500 to 550 mm 300 to 350 mm 400 to 450 mm 600 to 650 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 20 m 15 m 10 m 5 m 20 m 15 m 10 m 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 1 meter 4 meters 3 meters 2 meters 1 meter 4 meters 3 meters 2 meters ANSWER DOWNLOAD EXAMIANS APP