Building Construction Single Flemish bond consists of Stretcher bond facing and double Flemish bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course Double Flemish bond facing and header bond backing in each course Stretcher bond facing and double Flemish bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course Double Flemish bond facing and header bond backing in each course ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soils possessing low bearing capacity, the type of foundation generally provided, is Raft footing Column footing All of these Grillage footing Raft footing Column footing All of these Grillage footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 14 days 1 day 4 days 7 days 14 days 1 day 4 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 3.5 m 4.5 m 5.5 m 2.5 m 3.5 m 4.5 m 5.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 10 mm 30 mm 40 mm 20 mm 10 mm 30 mm 40 mm 20 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In English garden wall bond All of these Queen closer in provided in each heading course The middle course of stretchers is started with a header to give proper vertical joints One course of headers to three or five course of stretchers All of these Queen closer in provided in each heading course The middle course of stretchers is started with a header to give proper vertical joints One course of headers to three or five course of stretchers ANSWER DOWNLOAD EXAMIANS APP