Building Construction Single Flemish bond consists of English bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger borings are not common In soils that require lateral support In soft soils None of these In cohesive soils In soils that require lateral support In soft soils None of these In cohesive soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for beams and slabs; is 25 to 50 mm 30 to 125 mm 50 to 100 mm 25 to 75 mm 25 to 50 mm 30 to 125 mm 50 to 100 mm 25 to 75 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Buttress Breast wall Retaining wall Parapet wall Buttress Breast wall Retaining wall Parapet wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction In grillage foundations, distance between flanges of grillage beams, is kept Maximum of (A), (B) and (C) 40 cm Twice the flange width Equal to flange width Maximum of (A), (B) and (C) 40 cm Twice the flange width Equal to flange width ANSWER DOWNLOAD EXAMIANS APP