Building Construction The entrained concrete is used in lining walls and roofs for making Both (A) and (B) Heat insulated Sound insulated Neither (A) nor (B) Both (A) and (B) Heat insulated Sound insulated Neither (A) nor (B) ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 3 5 6 4 3 5 6 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A cut in frame of a door to receive the shutter, is called Louver Horn Rebate Stop Louver Horn Rebate Stop ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept Equal to its projection beyond wall base 15 cm 10 cm Less than its projection beyond wall base Equal to its projection beyond wall base 15 cm 10 cm Less than its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 25 mm 25 to 40 mm 65 to 100 mm 40 to 65 mm 25 mm 25 to 40 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 5, 4, 3, 2, 1 ANSWER DOWNLOAD EXAMIANS APP