Building Construction Nogging of a common wooden partition is Intermediate horizontal wooden member Upper horizontal wooden member Lower horizontal wooden member Vertical wooden member Intermediate horizontal wooden member Upper horizontal wooden member Lower horizontal wooden member Vertical wooden member ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Highest point on the extrados of the arch Highest point on the intrados of the arch Skew-back of the arch None of these Highest point on the extrados of the arch Highest point on the intrados of the arch Skew-back of the arch None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Bottom of beams and girders Sides of beams and girders All the above at the same time Column forms Bottom of beams and girders Sides of beams and girders All the above at the same time Column forms ANSWER DOWNLOAD EXAMIANS APP
Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Under pinning Scaffolding Raking shore Dead shore Under pinning Scaffolding Raking shore Dead shore ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 3 No limit 5 2 3 No limit 5 2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 300 to 350 mm 400 to 450 mm 500 to 550 mm 600 to 650 mm 300 to 350 mm 400 to 450 mm 500 to 550 mm 600 to 650 mm ANSWER DOWNLOAD EXAMIANS APP