Building Construction Nogging of a common wooden partition is Intermediate horizontal wooden member Lower horizontal wooden member Upper horizontal wooden member Vertical wooden member Intermediate horizontal wooden member Lower horizontal wooden member Upper horizontal wooden member Vertical wooden member ANSWER DOWNLOAD EXAMIANS APP
Building Construction Auger boring Is the most primitive method for making a hole in the ground All of these Is generally employed in cohesive and other self soils above water table Is most economical up-to a depth of 5 meters Is the most primitive method for making a hole in the ground All of these Is generally employed in cohesive and other self soils above water table Is most economical up-to a depth of 5 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: The seismic method Both (A) and (B) of the above Gravitational method Electrical resistivity method The seismic method Both (A) and (B) of the above Gravitational method Electrical resistivity method ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Ridge Crown Eave Rafter Ridge Crown Eave Rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 14 days 1 day 4 days 7 days 14 days 1 day 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for Prevention of dampness Sound insulation Heat insulation All of these Prevention of dampness Sound insulation Heat insulation All of these ANSWER DOWNLOAD EXAMIANS APP