Building Construction
Nogging of a common wooden partition is

Intermediate horizontal wooden member
Upper horizontal wooden member
Lower horizontal wooden member
Vertical wooden member

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In the method of tube boring of soil investigation, the following is essential:

A flap valve at the bottom of tube is provided to extract the soil sample
All listed here
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
A tube of about 2 meters length and 20 cm diameter with a cutting edge

ANSWER DOWNLOAD EXAMIANS APP