Building Construction In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is 2 cm 4 cm 8 cm 6 cm 2 cm 4 cm 8 cm 6 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are All the above at the same time Bottom of beams and girders Sides of beams and girders Column forms All the above at the same time Bottom of beams and girders Sides of beams and girders Column forms ANSWER DOWNLOAD EXAMIANS APP
Building Construction The term string is used for Outer projecting edge of a tread A vertical member between two treads The underside of a stair A sloping member which supports the steps in a stair Outer projecting edge of a tread A vertical member between two treads The underside of a stair A sloping member which supports the steps in a stair ANSWER DOWNLOAD EXAMIANS APP
Building Construction In grillage foundations a minimum 15 cm cover is provided on Upper flange of top tier Lower beam of lower tier Ends of external beams None to these Upper flange of top tier Lower beam of lower tier Ends of external beams None to these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Crown and ground level Crown and springing line Intrados and extrados Ground level and springing line Crown and ground level Crown and springing line Intrados and extrados Ground level and springing line ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be Half the width of stairs Equal to width of stairs One fourth the width of stairs Twice the width of stairs Half the width of stairs Equal to width of stairs One fourth the width of stairs Twice the width of stairs ANSWER DOWNLOAD EXAMIANS APP