Building Construction The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than Three-fourth the column spacing The column spacing Half the column spacing One-third the column spacing Three-fourth the column spacing The column spacing Half the column spacing One-third the column spacing ANSWER DOWNLOAD EXAMIANS APP
Building Construction In a colar beam roof There is no horizontal tie beam There are two horizontal ties, one at the feet and other at the middle of the rafters There is a horizontal tie at the feet of rafters only There is a horizontal tie at almost the middle of rafters only There is no horizontal tie beam There are two horizontal ties, one at the feet and other at the middle of the rafters There is a horizontal tie at the feet of rafters only There is a horizontal tie at almost the middle of rafters only ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 5 m 20 m 15 m 10 m 5 m 20 m 15 m 10 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Stud(s) of a common wooden partition Is the lower horizontal wooden member Are the intermediate horizontal wooden members Is the upper horizontal wooden member Are vertical wooden members Is the lower horizontal wooden member Are the intermediate horizontal wooden members Is the upper horizontal wooden member Are vertical wooden members ANSWER DOWNLOAD EXAMIANS APP
Building Construction The projections of head or sill of a door or window frame are Horns Stops Chocks Transoms Horns Stops Chocks Transoms ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 mm 25 to 40 mm 40 to 65 mm 65 to 100 mm 25 mm 25 to 40 mm 40 to 65 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP