Building Construction The bearing capacity of a water logged soil, may be improved by Drainage Grouting Compaction Chemical action Drainage Grouting Compaction Chemical action ANSWER DOWNLOAD EXAMIANS APP
Building Construction The taper of precast concrete pile should not be more than 5 cm per metre length 4 cm per metre length 2 cm per metre length 1 cm per metre length 5 cm per metre length 4 cm per metre length 2 cm per metre length 1 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of concrete bed of the foundation depends upon All listed here The projection of the concrete block beyond the footing over it The mix of the concrete The upward soil pressure All listed here The projection of the concrete block beyond the footing over it The mix of the concrete The upward soil pressure ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: Both (A) and (B) of the above The seismic method Gravitational method Electrical resistivity method Both (A) and (B) of the above The seismic method Gravitational method Electrical resistivity method ANSWER DOWNLOAD EXAMIANS APP
Building Construction Mansard roof is a roof which slopes in Four directions with break in the slope on each side Two directions without break in the slope on each side Four directions without break in the slope on each side Two directions with break in the slope on each side Four directions with break in the slope on each side Two directions without break in the slope on each side Four directions without break in the slope on each side Two directions with break in the slope on each side ANSWER DOWNLOAD EXAMIANS APP
Building Construction The horizontal timber piece provided at the apex of a roof truss which supports the common rafter is called Eaves board Ridge board Valley rafter Hip rafter Eaves board Ridge board Valley rafter Hip rafter ANSWER DOWNLOAD EXAMIANS APP