The mortar in which both cement and lime are used as binding materials, is called

Lime mortar
Gauged mortar
Cement mortar
Fire resistant mortar

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum total settlement for isolated foundations on clayey soils should be limited to

65 mm
100 mm
40 mm
25 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of multi-storeyed buildings, the forms to be removed first are

All the above at the same time
Bottom of beams and girders
Column forms
Sides of beams and girders

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to

15 mm
35 mm
25 mm
45 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The size of a floor tile commonly used, is

15 cm × 15 cm × 1.8 cm
All listed here
22.5 × 22.5 cm × 2.2 cm
20 cm × 20 cm × 2 cm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Bearing capacity of soils cannot be improved by

Ramming crushed stone in soil
Driving sand piles
Watering surface of soil
Draining sub-soil water

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑