Building Construction Expansion joints in masonry walls are provided if length exceeds 40 m 20 m 10 m 30 m 40 m 20 m 10 m 30 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample ANSWER DOWNLOAD EXAMIANS APP
Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act Within the middle fifth of the base Within the middle third of the base Neither (A), (B) nor (C) At the centre of the base Within the middle fifth of the base Within the middle third of the base Neither (A), (B) nor (C) At the centre of the base ANSWER DOWNLOAD EXAMIANS APP
Building Construction Queen closer may be placed In header course next to first brick In stretcher course next to first brick In stretcher course In header course In header course next to first brick In stretcher course next to first brick In stretcher course In header course ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/12th of the span 1/10th of the span 1/8th of the span 1/6th of the span 1/12th of the span 1/10th of the span 1/8th of the span 1/6th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum bearing capacity of soil is that of Hard rocks Loose fine sandy soil Dry coarse sandy soil Black cotton soil Hard rocks Loose fine sandy soil Dry coarse sandy soil Black cotton soil ANSWER DOWNLOAD EXAMIANS APP