Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is Pipe pile Disc pile H-pile Screw pile Pipe pile Disc pile H-pile Screw pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical members fixed between steps and hand rail, are known Soffits Strings Newel posts Balusters Soffits Strings Newel posts Balusters ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wall constructed to resist the pressure of an earth filling, is called Parapet wall Buttress Retaining wall Breast wall Parapet wall Buttress Retaining wall Breast wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called Bedding Topping None of these Screeding Bedding Topping None of these Screeding ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 3 5 4 6 3 5 4 6 ANSWER DOWNLOAD EXAMIANS APP