Building Construction Pile foundations are suitable for Soft rocks Compact soils Multi-storeyed buildings Water logged soils Soft rocks Compact soils Multi-storeyed buildings Water logged soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 14 days 7 days 1 day 4 days 14 days 7 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 5 to 10 cm 30 to 45 cm 15 to 20 cm 25 to 30 cm 5 to 10 cm 30 to 45 cm 15 to 20 cm 25 to 30 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction An arch may fail due to Crushing of the material All listed here Uneven settlement of abutments Sliding of voussoirs Crushing of the material All listed here Uneven settlement of abutments Sliding of voussoirs ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statements from the following: Cracks appear on the plastered surface in the form of hair cracks All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall Cracks appear on the plastered surface in the form of hair cracks All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to National Building Code, the hydrants in water mains is provided at minimum interval of 50 m 75 m 60 m 90 m 50 m 75 m 60 m 90 m ANSWER DOWNLOAD EXAMIANS APP