Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Simplex pile Raymond pile Mac-Arthur pile Franki pile Simplex pile Raymond pile Mac-Arthur pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto Ceiling Level of the tap 200 cm 15 cm above floor level Ceiling Level of the tap 200 cm 15 cm above floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Peeling Blistering Dubbing Hacking Peeling Blistering Dubbing Hacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 3 5 No limit 2 3 5 No limit 2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 90° 30° 0° 60° 90° 30° 0° 60° ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 40 1 in 60 1 in 50 1 in 70 1 in 40 1 in 60 1 in 50 1 in 70 ANSWER DOWNLOAD EXAMIANS APP