Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Mac-Arthur pile Franki pile Raymond pile Simplex pile Mac-Arthur pile Franki pile Raymond pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following piles has a cast iron shoe even after removal of the hollow cylindrical steel casing? Pedestal pile Simplex pile Vibro pile Both (A) and (C) of the above Pedestal pile Simplex pile Vibro pile Both (A) and (C) of the above ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 14 days 3 days 7 days 21 days 14 days 3 days 7 days 21 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Sides of beams and girders All the above at the same time Column forms Bottom of beams and girders Sides of beams and girders All the above at the same time Column forms Bottom of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction Arches in the form of masonry arcs struck from more than four centres, are called Ogee arches Gothic arches Two curved arches Drop gothic arches Ogee arches Gothic arches Two curved arches Drop gothic arches ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of Header bond English bond Stretcher bond Single Flemish bond Header bond English bond Stretcher bond Single Flemish bond ANSWER DOWNLOAD EXAMIANS APP