Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Mac-Arthur pile Raymond pile Franki pile Simplex pile Mac-Arthur pile Raymond pile Franki pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Raft foundation are generally preferred to when the area required for individual footing, is more than 30% of total area 25% to total area 40% to total area 50% of total area 30% of total area 25% to total area 40% to total area 50% of total area ANSWER DOWNLOAD EXAMIANS APP
Building Construction The least bearing capacity of soil is that of Coarse sandy soil Moist clay Soft rock Hard rock Coarse sandy soil Moist clay Soft rock Hard rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 5 No limit 2 3 5 No limit 2 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Ridge Eave Rafter Crown Ridge Eave Rafter Crown ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Retaining wall Breast wall Buttress Parapet wall Retaining wall Breast wall Buttress Parapet wall ANSWER DOWNLOAD EXAMIANS APP