Building Construction

Building Construction
The pile which is provided with a bulb filled with concrete at its lower end, is known as

Raymond pile
Simplex pile
Mac-Arthur pile
Franki pile

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The depth of excavation of foundations, is generally measured with a

Ranging rod
Boning rod
Levelling staff
Steel tape

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
As compared to stretcher course, the thickness of joints in header course should be

Equal or more
More
Equal
Less

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The concrete slump recommended for beams and slabs; is

25 to 50 mm
50 to 100 mm
30 to 125 mm
25 to 75 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than

h/4
1/2h
2 h
h

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as

Rat-trap bond
Monk bond
English cross bond
Dutch bond

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑