Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Raymond pile Mac-Arthur pile Simplex pile Franki pile Raymond pile Mac-Arthur pile Simplex pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Stability of an existing structure may be disturbed by Rising of water table All listed here Mining in the neighborhood Vibrations caused by traffic movements Rising of water table All listed here Mining in the neighborhood Vibrations caused by traffic movements ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 4 days 1 day 7 days 14 days 4 days 1 day 7 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of granite is generally 40 to 45 kg/cm² 15 to 20 kg/cm² 5 to 10 kg/cm² 30 to 35 kg/cm² 40 to 45 kg/cm² 15 to 20 kg/cm² 5 to 10 kg/cm² 30 to 35 kg/cm² ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 15 m 10 m 40 m 20 m 15 m 10 m 40 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum number of steps in a flight should generally be restricted to No limit 10 15 12 No limit 10 15 12 ANSWER DOWNLOAD EXAMIANS APP