Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Franki pile Raymond pile Mac-Arthur pile Simplex pile Franki pile Raymond pile Mac-Arthur pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Ground level Midway ground level and water-table level Water table level Plinth level Ground level Midway ground level and water-table level Water table level Plinth level ANSWER DOWNLOAD EXAMIANS APP
Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act Within the middle third of the base At the centre of the base Within the middle fifth of the base Neither (A), (B) nor (C) Within the middle third of the base At the centre of the base Within the middle fifth of the base Neither (A), (B) nor (C) ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Marble floor Mosaic floor Terrazzo floor Chips floor Marble floor Mosaic floor Terrazzo floor Chips floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Crown and ground level Crown and springing line Ground level and springing line Intrados and extrados Crown and ground level Crown and springing line Ground level and springing line Intrados and extrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 14 days 7 days 4 days 1 day 14 days 7 days 4 days ANSWER DOWNLOAD EXAMIANS APP