Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Raymond pile Simplex pile Mac-Arthur pile Franki pile Raymond pile Simplex pile Mac-Arthur pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Highest point on the intrados of the arch Skew-back of the arch Highest point on the extrados of the arch None of these Highest point on the intrados of the arch Skew-back of the arch Highest point on the extrados of the arch None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its length parallel to the face of a wall, is a known as Closer None of these Stretcher Header Closer None of these Stretcher Header ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 in 5 1 in 20 1 to 50 1 in 10 1 in 5 1 in 20 1 to 50 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 2 1 : 3 1 : 6 1 : 4 1 : 2 1 : 3 1 : 6 1 : 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: The length of the foundation slab = 7.00 m Distance of C.G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 All listed here The length of the foundation slab = 7.00 m Distance of C.G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 All listed here ANSWER DOWNLOAD EXAMIANS APP