Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Raymond pile Franki pile Mac-Arthur pile Simplex pile Raymond pile Franki pile Mac-Arthur pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Eave Crown Rafter Ridge Eave Crown Rafter Ridge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower half portion between crown and skew back of the arch, is called Springing Spandril Soffit Haunch Springing Spandril Soffit Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Skew-back of the arch Highest point on the intrados of the arch Highest point on the extrados of the arch None of these Skew-back of the arch Highest point on the intrados of the arch Highest point on the extrados of the arch None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Workability Strength Stability of structure All listed here Workability Strength Stability of structure All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 6 1 : 3 1 : 4 1 : 2 1 : 6 1 : 3 1 : 4 1 : 2 ANSWER DOWNLOAD EXAMIANS APP