Building Construction
In the method of tube boring of soil investigation, the following is essential:

A flap valve at the bottom of tube is provided to extract the soil sample
All listed here
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
A tube of about 2 meters length and 20 cm diameter with a cutting edge

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Pick up the correct statements from the following:

Excessive thermal variations in the backing or plaster causes the plaster to fall
All listed here
Cracks appear on the plastered surface in the form of hair cracks
In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water