Building Construction The maximum number of steps in a flight should generally be restricted to 12 No limit 10 15 12 No limit 10 15 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction Weep holes are provided in retaining and breast walls To add architectural beauty To ventilate the stone masonry To drain off the water from the filling To increase compaction of the earth retained To add architectural beauty To ventilate the stone masonry To drain off the water from the filling To increase compaction of the earth retained ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 1 day 7 days 4 days 14 days 1 day 7 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Vertical construction joints are provided where the shearing forces are minimum in the case of Slabs All of these Girders Beams Slabs All of these Girders Beams ANSWER DOWNLOAD EXAMIANS APP
Building Construction The under surface of an arch, is called Haunch Intrados Back Soffit Haunch Intrados Back Soffit ANSWER DOWNLOAD EXAMIANS APP