Building Construction Raft foundation are generally preferred to when the area required for individual footing, is more than 40% to total area 30% of total area 50% of total area 25% to total area 40% to total area 30% of total area 50% of total area 25% to total area ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wall constructed to resist the pressure of an earth filling, is called Retaining wall Parapet wall Buttress Breast wall Retaining wall Parapet wall Buttress Breast wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 in 5 1 in 10 1 in 20 1 to 50 1 in 5 1 in 10 1 in 20 1 to 50 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Clay soils Sandy soil Rocky soils All of these Clay soils Sandy soil Rocky soils All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to English bond, double Flemish bond is None of these Costly More compact Stronger None of these Costly More compact Stronger ANSWER DOWNLOAD EXAMIANS APP
Building Construction An arch constructed with finely dressed stones, is known Gauged arch Rubble arch Axed arch Ashlar arch Gauged arch Rubble arch Axed arch Ashlar arch ANSWER DOWNLOAD EXAMIANS APP