Building Construction In case of multi-storeyed buildings, the forms to be removed first are Sides of beams and girders All the above at the same time Column forms Bottom of beams and girders Sides of beams and girders All the above at the same time Column forms Bottom of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for foundations, is 75 to 125 mm 30 to 125 mm 50 to 100 mm 25 to 50 mm 75 to 125 mm 30 to 125 mm 50 to 100 mm 25 to 50 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Post Style Mullion Reveal Post Style Mullion Reveal ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Crown and ground level Ground level and springing line Intrados and extrados Crown and springing line Crown and ground level Ground level and springing line Intrados and extrados Crown and springing line ANSWER DOWNLOAD EXAMIANS APP
Building Construction Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to 1/2 1/4 2 1 1/2 1/4 2 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 1 day 7 days 14 days 4 days 1 day 7 days 14 days 4 days ANSWER DOWNLOAD EXAMIANS APP