Building Construction The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as Grouting Troweling Laying Placing Grouting Troweling Laying Placing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The opening provided in sloping roof with its top parallel to the roof surface, is called Lantern window Louvered window Dormer window Sky light window Lantern window Louvered window Dormer window Sky light window ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lintels are preferred to arches because Arches require strong abutments to withstand arch thrust All of these Arches are difficult in construction Arches require more headroom to span the openings like doors, windows etc. Arches require strong abutments to withstand arch thrust All of these Arches are difficult in construction Arches require more headroom to span the openings like doors, windows etc. ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Between ceiling and ground level Upto roof above ground level Between ceiling and floor level Upto ceiling from the ground level Between ceiling and ground level Upto roof above ground level Between ceiling and floor level Upto ceiling from the ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is, Q = Wh/2.5 (S + 6) Q = (W × 2.5)/6 (S + h) Q = (W × 6)/h (S + 2.5) Q = Wh/6 (S + 2.5) Q = Wh/2.5 (S + 6) Q = (W × 2.5)/6 (S + h) Q = (W × 6)/h (S + 2.5) Q = Wh/6 (S + 2.5) ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundation is generally provided if soil is All listed here Made up Compressible Water logged All listed here Made up Compressible Water logged ANSWER DOWNLOAD EXAMIANS APP