Building Construction
The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as

Grouting
Placing
Troweling
Laying

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following:

All listed here
G. of the loads from the smaller column = 3.00 m
Distance of
Area of footing slab = 11.00 m2
The length of the foundation slab = 7.00 m

ANSWER DOWNLOAD EXAMIANS APP