Building Construction The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as Grouting Laying Troweling Placing Grouting Laying Troweling Placing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The voussoir placed at crown of an arch, is known as a Key Haunch Soffit Springer Key Haunch Soffit Springer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 2 No limit 5 3 2 No limit 5 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of concrete bed of the foundation depends upon All listed here The upward soil pressure The mix of the concrete The projection of the concrete block beyond the footing over it All listed here The upward soil pressure The mix of the concrete The projection of the concrete block beyond the footing over it ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum bearing capacity of soil is that of Hard rocks Loose fine sandy soil Black cotton soil Dry coarse sandy soil Hard rocks Loose fine sandy soil Black cotton soil Dry coarse sandy soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Strap footing Combined footing Raft footing Strip footing Strap footing Combined footing Raft footing Strip footing ANSWER DOWNLOAD EXAMIANS APP