Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 0° 30° 90° 60° 0° 30° 90° 60° ANSWER DOWNLOAD EXAMIANS APP
Building Construction In English garden wall bond Queen closer in provided in each heading course The middle course of stretchers is started with a header to give proper vertical joints All of these One course of headers to three or five course of stretchers Queen closer in provided in each heading course The middle course of stretchers is started with a header to give proper vertical joints All of these One course of headers to three or five course of stretchers ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its length parallel to the face of a wall, is a known as Closer Stretcher Header None of these Closer Stretcher Header None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Lighter in weight Extremely durable Easy to handle All of these Lighter in weight Extremely durable Easy to handle All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of Stretcher bond English bond Single Flemish bond Header bond Stretcher bond English bond Single Flemish bond Header bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called Bedding Screeding None of these Topping Bedding Screeding None of these Topping ANSWER DOWNLOAD EXAMIANS APP