Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 30° 60° 0° 90° 30° 60° 0° 90° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Boning rod Ranging rod Steel tape Levelling staff Boning rod Ranging rod Steel tape Levelling staff ANSWER DOWNLOAD EXAMIANS APP
Building Construction The size of a floor tile commonly used, is 15 cm × 15 cm × 1.8 cm 20 cm × 20 cm × 2 cm All listed here 22.5 × 22.5 cm × 2.2 cm 15 cm × 15 cm × 1.8 cm 20 cm × 20 cm × 2 cm All listed here 22.5 × 22.5 cm × 2.2 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 15 to 20 cm 5 to 10 cm 30 to 45 cm 25 to 30 cm 15 to 20 cm 5 to 10 cm 30 to 45 cm 25 to 30 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of concrete bed of the foundation depends upon The projection of the concrete block beyond the footing over it The upward soil pressure The mix of the concrete All listed here The projection of the concrete block beyond the footing over it The upward soil pressure The mix of the concrete All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction To obtain good bonding in brick masonry Vertical joints in alternate courses are kept in plumb line Bats are used where necessary All of these First class bricks are used Vertical joints in alternate courses are kept in plumb line Bats are used where necessary All of these First class bricks are used ANSWER DOWNLOAD EXAMIANS APP