Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 90° 30° 60° 0° 90° 30° 60° 0° ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Dormer window Rash window Lantern window Louvered window Dormer window Rash window Lantern window Louvered window ANSWER DOWNLOAD EXAMIANS APP
Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Strap footing Raft footing Combined footing Pier footing Strap footing Raft footing Combined footing Pier footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Raft foundation are generally preferred to when the area required for individual footing, is more than 30% of total area 40% to total area 25% to total area 50% of total area 30% of total area 40% to total area 25% to total area 50% of total area ANSWER DOWNLOAD EXAMIANS APP
Building Construction In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is 6 cm 2 cm 8 cm 4 cm 6 cm 2 cm 8 cm 4 cm ANSWER DOWNLOAD EXAMIANS APP