Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 30° 90° 0° 60° 30° 90° 0° 60° ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dampness causes Growth of termites Crumbling of plaster Efflorescence Bleaching of paints Growth of termites Crumbling of plaster Efflorescence Bleaching of paints ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 40 mm 100 mm 25 mm 65 mm 40 mm 100 mm 25 mm 65 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wooden block fixed on back side of a door frame on its post, is known as Horn Stop Cleat None of these Horn Stop Cleat None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 3.5 m 5.5 m 4.5 m 2.5 m 3.5 m 5.5 m 4.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The function of king post in a king post roof truss is To receive the ends of principal rafter To prevent the tie beam from sagging at its centre To prevent the walls from spreading outward To support the frame work of the roof To receive the ends of principal rafter To prevent the tie beam from sagging at its centre To prevent the walls from spreading outward To support the frame work of the roof ANSWER DOWNLOAD EXAMIANS APP