Building Construction
The disease of dry rot in timber is caused by

Alternate wet and dry conditions
Complete submergence in water
Lack of ventilation
None of these

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In the method of tube boring of soil investigation, the following is essential:

A flap valve at the bottom of tube is provided to extract the soil sample
A tube of about 2 meters length and 20 cm diameter with a cutting edge
All listed here
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand

ANSWER DOWNLOAD EXAMIANS APP