Building Construction Couple close roof is suitable for maximum span of 2.5 m 3.5 m 4.5 m 5.5 m 2.5 m 3.5 m 4.5 m 5.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as Placing Grouting Laying Troweling Placing Grouting Laying Troweling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its breadth parallel to the face of a wall, is known as Header None of these Closer Stretcher Header None of these Closer Stretcher ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soft clay of low bearing capacity, the type of steel pile generally used, is Pipe pile Disc pile H-pile Screw pile Pipe pile Disc pile H-pile Screw pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The sound which continues even after its source is cut off, is called Echo Interference Intensity of sound Reverberation Echo Interference Intensity of sound Reverberation ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 15 to 20 cm 30 to 45 cm 25 to 30 cm 5 to 10 cm 15 to 20 cm 30 to 45 cm 25 to 30 cm 5 to 10 cm ANSWER DOWNLOAD EXAMIANS APP