Building Construction The alignment of a cross joint along the plumb line is Perpend Lintel Bed block Vertical line Perpend Lintel Bed block Vertical line ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of piles is determined by Pile load tests Static formula Dynamic formula All of these Pile load tests Static formula Dynamic formula All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Weep holes are provided in retaining and breast walls To add architectural beauty To drain off the water from the filling To ventilate the stone masonry To increase compaction of the earth retained To add architectural beauty To drain off the water from the filling To ventilate the stone masonry To increase compaction of the earth retained ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 7 days 4 days 1 day 14 days 7 days 4 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction Single Flemish bond consists of Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Double Flemish bond facing and English bond backing in each course English bond facing and double Flemish bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Double Flemish bond facing and English bond backing in each course English bond facing and double Flemish bond backing in each course ANSWER DOWNLOAD EXAMIANS APP
Building Construction The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called Brick on end Brick held vertically Brick on edge Brick on bed Brick on end Brick held vertically Brick on edge Brick on bed ANSWER DOWNLOAD EXAMIANS APP