Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Raft footing Pier footing Combined footing Strap footing Raft footing Pier footing Combined footing Strap footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Compaction of concrete Curing of concrete Placing of concrete Finishing of concrete Compaction of concrete Curing of concrete Placing of concrete Finishing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided in flat roof of a room, is known Lantern window Sky window Louvered window Dormer window Lantern window Sky window Louvered window Dormer window ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto Level of the tap 200 cm 15 cm above floor level Ceiling Level of the tap 200 cm 15 cm above floor level Ceiling ANSWER DOWNLOAD EXAMIANS APP
Building Construction Ornamental moulded course placed on the top of a wall, is Coping Lintel Frieze Cornice Coping Lintel Frieze Cornice ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a wall carrying heavy load on low bearing capacity soil, Both (A) and (C) of the above Thick concrete bed is provided Lean concrete bed is provided Reinforced concrete bed is provided Both (A) and (C) of the above Thick concrete bed is provided Lean concrete bed is provided Reinforced concrete bed is provided ANSWER DOWNLOAD EXAMIANS APP