Building Construction Rotary drilling is the fastest method in case of Sandy soil Rocky soils All of these Clay soils Sandy soil Rocky soils All of these Clay soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical sides of a door and window openings provided in a wall, are known as Verticals Jambs Reveals None of these Verticals Jambs Reveals None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 6.5 m but less than 8 m 5 m but less than 6.5 m 3.5 m or less 3.5 m but less than 5 m 6.5 m but less than 8 m 5 m but less than 6.5 m 3.5 m or less 3.5 m but less than 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: None of these Igneous rock Sedimentary rock Metamorphic rock None of these Igneous rock Sedimentary rock Metamorphic rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Peeling Hacking Dubbing Blistering Peeling Hacking Dubbing Blistering ANSWER DOWNLOAD EXAMIANS APP
Building Construction Negative skin friction Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Neither (A) not (B) Both (A) and (B) Develops due to lowering of ground water Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Neither (A) not (B) Both (A) and (B) Develops due to lowering of ground water ANSWER DOWNLOAD EXAMIANS APP